Muster Bids
Home › Bids › General Construction › North Carolina › FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam

Can I bid? · SDVOSB set-aside

FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)

Response due Dec 2, 2026, 9:00 AM (UTC−5) ·

In plain English

Department of Veterans Affairs posted this SDVOSB set-aside for construction work in Durham, NC. Scope, from the notice: General: The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. This is an open solicitation: the agency is accepting offers now.

Summary generated automatically from the SAM.gov notice text. Read the full solicitation before bidding.

The basics

Agency
Department of Veterans Affairs
Sub-agency
Not listed in the notice
Contracting office
246-network Contracting Office 6 (36C246)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice type
Solicitation
Solicitation #
36C24626B0041_1
NAICS code
236220
Product/service code
Z2DA
Trade (our grouping)
General Construction
Place of performance
Durham, NC
State
North Carolina
Posted
2026-10-23
Response deadline
Dec 2, 2026, 9:00 AM (UTC−5)
Official notice
sam.gov/opp/5233db81…

Flags to check before you bid

No site-visit, bonding, wage-rate or dollar-size language found in the notice text we have. Check the full solicitation and attachments on SAM.gov.

From the notice

Replace Domestic Water, Chilled Water, and Steam Piping Project Number 558-24-160 STATEMENT OF WORK Description of Work - Summary: The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping. General: The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and…

Read the full notice and attachments on SAM.gov →

Request help on this bid

Tell us about your firm and we'll reply within 1 business day with a fixed quote. No payment is taken yet. Please don't send SSNs, SAM.gov/UEI logins, or bank or card details.